CN

R&D and Manufacturing

One-stop solution R&D, customization and mass production for special batteries.

R&D Team

Currently, Huide Technology has a research and development team 30 Multiple people, with a higher proportion of members holding a bachelor's degree or above 95%;
The company has a complete organizational structure, and most members have industry experience 5 years The above.

Testing Items

Testing Laboratory Testing Capability & Test Items (GB31467)

High-Low Temperature Test

Constant Humidity-Heat Test

Alternating Humidity-Heat Test

Performance Test

Salt Spray Test

Rapid Temperature Change Test

Temperature Test

Dustproof and Waterproof Test

Vibration Test

Tipping Test

Three-in-One Comprehensive Test

Collision Test

Temperature Cycle Test

Shock Test

Deep Sea Pressure Resistance Test

Deep-sea pressure simulation test to predict structural risks and ensure sealing and long-term reliability.

Thermal Analysis Capability

Test the thermal characteristics of cells to predict thermal runaway and ensure battery safety.

Thermal and Safety Research

Temperature Field Simulation Analysis

Mechanical Simulation Analysis

Testing Workshop

Lithium battery aging test adopts high-precision automatic charge-discharge aging equipment.

Equipped with professional and advanced automatic charge-discharge aging cabinets, it can complete cyclic charge and discharge, capacity detection, differential pressure monitoring and BMS protection function verification of battery packs, stabilize cell consistency, and ensure stable and reliable performance of battery pack capacity, BMS protection, temperature rise and other indicators.

Manufacturing Capacity

PACK Manufacturing Workshop Assembly Line

Manufacturing Process Flow

Full-process controlled production to stabilize battery quality and consistency

1. IQC

2. Cell Sorting

3. Module Assembly

4. Welding and Cabling

5. BMS Assembly

6. Module Test

7. Aging Test

8. Packaging and Fixing

9. FQC Final Product Inspection

10. OQC Outgoing Inspection

1. IQC

2. Cell Sorting

3. Module Assembly

4. Welding and Cabling

5. BMS Assembly

6. Module Test

7. Aging Test

8. Packaging and Fixing

9. FQC Final Product Inspection

10. OQC Outgoing Inspection